CHGOCC 20-30 Franklin ST
Open · Massachusetts
Source: City of Boston
Change Occupancy from;a Retail Store, Office, and Ticket Sales to Offices and Ticket Sales. Retail space to be changed to Office. Level existing concrete floor with concrete surface coat less than 3 inches thick Install access panel in floor for drain clean-out. ;Frame ramp at garage door with lumber to be level with existing floor Remove garage door Replace concrete sill at garage door Install 6”
- Status
- Prospective
- Sector
- Car parking, Steel, Forest Products and Packaging, Cement, Metal, Residential, Commercial, Government, Waste Processing and Treatment, Automotive
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about CHGOCC 20-30 Franklin ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Change Occupancy from;a Retail Store, Office, and Ticket Sales to Offices and Ticket Sales. Retail space to be changed to Office. Level existing concrete floor with concrete surface coat less than 3 inches thick Install access panel in floor for drain clean-out. ;Frame ramp at garage door with lumber to be level with existing floor Remove garage door Replace concrete sill at garage door Install 6” concrete block on sill to height of approximately 2 feet Install brick layer on outer face of concrete block Install layer of brick on top row of brick angled down for run-off Install aluminum frame and safety glass window 8 feet wide and 6 feet high Cut-out concrete ramp on interior floor at Braintree St entry door Apply vapor barrier to floor Apply laminate flooring to entire floor surface Repair holes in wallboard with fire-block insulation backing Repair and resurface wallboard with plaster Apply decorative column covers on lally poles Paint all surfaces Clean-up and removal of all debris |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Car parking, Steel, Forest Products and Packaging, Cement, Metal, Residential, Commercial, Government, Waste Processing and Treatment, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
