logo
ProjectOpenBP

CHGOCC 20-30 Franklin ST

Open · Massachusetts

Source: City of Boston

Change Occupancy from;a Retail Store, Office, and Ticket Sales to Offices and Ticket Sales. Retail space to be changed to Office. Level existing concrete floor with concrete surface coat less than 3 inches thick Install access panel in floor for drain clean-out. ;Frame ramp at garage door with lumber to be level with existing floor Remove garage door Replace concrete sill at garage door Install 6”

Status
Prospective
Sector
Car parking, Steel, Forest Products and Packaging, Cement, Metal, Residential, Commercial, Government, Waste Processing and Treatment, Automotive
Location
Brighton, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about CHGOCC 20-30 Franklin ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CHGOCC 20-30 Franklin ST” is an infrastructure initiative in the Car parking sector, located in Brighton, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Change Occupancy from;a Retail Store, Office, and Ticket Sales to Offices and Ticket Sales. Retail space to be changed to Office. Level existing concrete floor with concrete surface coat less than 3 inches thick Install access panel in floor for drain clean-out. ;Frame ramp at garage door with lumber to be level with existing floor Remove garage door Replace concrete sill at garage door Install 6” concrete block on sill to height of approximately 2 feet Install brick layer on outer face of concrete block Install layer of brick on top row of brick angled down for run-off Install aluminum frame and safety glass window 8 feet wide and 6 feet high Cut-out concrete ramp on interior floor at Braintree St entry door Apply vapor barrier to floor Apply laminate flooring to entire floor surface Repair holes in wallboard with fire-block insulation backing Repair and resurface wallboard with plaster Apply decorative column covers on lally poles Paint all surfaces Clean-up and removal of all debris

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Brighton

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Car parking, Steel, Forest Products and Packaging, Cement, Metal, Residential, Commercial, Government, Waste Processing and Treatment, Automotive

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project