CHGOCC 296 Cambridge ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Change occupancy from Retail Store to Restaurant with take out. Interior fit out for Dunkin' Donuts work to include interior partitions, ceilings floors, wall finishes, millwork, kitchen equipment, all associated MEP life safety including minor sprinkler and fire alarm system modifications, exterior signage.
- Status
- Prospective
- Sector
- Commercial, Government, Residential
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about CHGOCC 296 Cambridge ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Change occupancy from Retail Store to Restaurant with take out. Interior fit out for Dunkin' Donuts work to include interior partitions, ceilings floors, wall finishes, millwork, kitchen equipment, all associated MEP life safety including minor sprinkler and fire alarm system modifications, exterior signage. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Residential |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
