CHGOCC 6 Ericsson ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Change of Occupancy from;a Printing Company to Light Assembly. The applicant would not manufacture any goods on site. The applicant simply receives pre-manufactured panels and electronics which are assembled at the location and shipped. There are no solvents or potentially hazardous wastes of any kind used in this assembly process. There would be no loud noise or odors associated with this work, o
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about CHGOCC 6 Ericsson ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Change of Occupancy from;a Printing Company to Light Assembly. The applicant would not manufacture any goods on site. The applicant simply receives pre-manufactured panels and electronics which are assembled at the location and shipped. There are no solvents or potentially hazardous wastes of any kind used in this assembly process. There would be no loud noise or odors associated with this work, or emanating from the building. The applicant has about 10-15 employees on site. The applicant will not be doing any construction, build-out or structural changes to the building. The applicant currently operates this business at another location in the City of Boston.; Construct new Egress stairs from existing Mezzanine spaces.; |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
