CHGOCC 77-81 Milk ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Change Occupancy to add: Wireless Telecommunication Facility At 77-81 Milk Street install 4 roof top antennas concealed within a 11’ tall 2’.6” diameter canister [painted light gray to match interior of parapet wall] and a second array of 4 antennas affixed to façade of existing penthouse with cable runs to equipment room and to a 3rd array of 4 antennas located at 14-24 Federal Street, all as sho
- Status
- Prospective
- Sector
- Road, Broadband, Telecommunications, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about CHGOCC 77-81 Milk ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Change Occupancy to add: Wireless Telecommunication Facility At 77-81 Milk Street install 4 roof top antennas concealed within a 11’ tall 2’.6” diameter canister [painted light gray to match interior of parapet wall] and a second array of 4 antennas affixed to façade of existing penthouse with cable runs to equipment room and to a 3rd array of 4 antennas located at 14-24 Federal Street, all as shown on plans filed herewith. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Broadband, Telecommunications, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
