logo

Chicago Avenue Reconstruction

Sector: Cement • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: Palm Avenue to Cedar Avenue Length: Approximately 4,000 feet District: 3 Community: Valle Vista

The County of Riverside Transportation Department is proposing to reconstruct approximately 4,000 feet of Chicago Avenue from Palm Avenue to Cedar Avenue. Chicago Avenue is classified as a local road in the County of Riverside’s General Plan. Chicago Avenue is a two lane road and currently ran

Project Information FAQ

Project Information

4 Q
The project “Chicago Avenue Reconstruction” is an infrastructure initiative in the Cement sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Palm Avenue to Cedar Avenue Length: Approximately 4,000 feet District: 3 Community: Valle Vista The County of Riverside Transportation Department is proposing to reconstruct approximately 4,000 feet of Chicago Avenue from Palm Avenue to Cedar Avenue. Chicago Avenue is classified as a local road in the County of Riverside’s General Plan. Chicago Avenue is a two lane road and currently ranges from 25-64 feet wide with curb/gutter along various segments of the roadway. The proposed project will include removing the roadway, treating the base and underlying material with cement, and placing back Hot Mix Asphalt (HMA) and Asphalt Rubber Hot Mix (ARHM). The proposed project will also include: Reconstruction of concrete curb/gutter, cross gutter, spandrel, and ADA deficient curb ramps Construction of asphalt concrete overside drain Replacement of corrugated metal pipe Placement of safety edge and shoulder backing Utility adjustments Striping of roadway to include bike lanes and center median Salvage/removal and installation of new signs No additional right-of-way will be required to construct the proposed improvements. The project improvements will remain within the existing footprint of the roadway and will not raise the existing roadway profile.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data