Chicago O'Hare International Airport Terminal 5 Expansion
Under construction · Illinois · Last reported Jan 2023
Source: loveEXPLORING
The Terminal 5 expansion at Chicago O'Hare International Airport is part of the O'Hare 21 modernization project. The expansion features a wing-shaped structure with a white metal and glass facade, a vaulted ceiling, and natural light wells. The expansion was completed in 2023, but the overall airport expansion and rebuild timeline was pushed back to 2034.
- Status
- Under Construction
- Sector
- Airport, Metal
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- loveEXPLORING
ConstructChat
Ask ConstructChat about Chicago O'Hare International Airport Terminal 5 Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Terminal 5 expansion at Chicago O'Hare International Airport is part of the O'Hare 21 modernization project. The expansion features a wing-shaped structure with a white metal and glass facade, a vaulted ceiling, and natural light wells. The expansion was completed in 2023, but the overall airport expansion and rebuild timeline was pushed back to 2034. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | loveEXPLORING |
URL |
More Details
Record type | Project |
Sector | Airport, Metal |
Article published date | 2025-06-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in USA
- Corn-to-Methanol Biofuel Research Project
- Pathfinder 1 Zero-Emission Airship
- Oklahoma Aerospace Education Framework FY 2026
- Sarasota Bradenton International Airport Allegiant Terminal
- Warehouse Site Selection for HCRFT in New York City
- SAFFiRE Cellulosic Ethanol Pilot Plant
- Development of Large Displays for Eurofighter Typhoon
- PG&E, Nissan, and Fermata Energy V2X Microgrid Demonstration
