Chicago St. Storm Drain Upsizing
Sector: Metal • Location: Turner, Oregon, United States of America
Source: Dodge USA
. The scope of work includes furnishing and installing approximately 899 feet of 15-inch HDPE N-12 storm drain, 131 feet of 10-inch HDPE N-12 storm drain, 213 feet of 18 and 10-inch ductile iron storm drain, manholes, catch basins, an outfall to Mill Creek, temporary surface restoration and maintenance, permanent surface restoration, traffic control, erosion control and other work as shown in the
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Waste Processing and Treatment, Road, Government, Steel, Commercial, Manufacturing (Industrial)
- Location
- Turner, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chicago St. Storm Drain Upsizing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | . The scope of work includes furnishing and installing approximately 899 feet of 15-inch HDPE N-12 storm drain, 131 feet of 10-inch HDPE N-12 storm drain, 213 feet of 18 and 10-inch ductile iron storm drain, manholes, catch basins, an outfall to Mill Creek, temporary surface restoration and maintenance, permanent surface restoration, traffic control, erosion control and other work as shown in the construction drawings and contract documents. Construction is anticipated to begin on or after Ju... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Turner |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Waste Processing and Treatment, Road, Government, Steel, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
