logo

Chief Joseph Dam Iso-Phase Powerbus Units 1-16

Sector: Hydro • Location: Bridgeport, Washington, United States of America

Source: Dodge USA

Project
Closed

OVERVIEW: This is a combination of replacement and refurbishment of the isolated phase buses that support generating units 1-16 at the Chief Joseph Dam (CJD) in Bridgeport, WA. The scope of this Contract covers the following: 1. Replacement of outdoor sections of the isolated phase bus. The 7000A sections of the bus for Transformer Banks T1 will be replaced with 8000A sections. The work must inclu

Status
Closed
Sector
Hydro, Road, Commercial, Water Supply and Storage
Location
Bridgeport, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Chief Joseph Dam Iso-Phase Powerbus Units 1-16

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Chief Joseph Dam Iso-Phase Powerbus Units 1-16” is an infrastructure initiative in the Hydro sector, located in Bridgeport, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

OVERVIEW: This is a combination of replacement and refurbishment of the isolated phase buses that support generating units 1-16 at the Chief Joseph Dam (CJD) in Bridgeport, WA. The scope of this Contract covers the following: 1. Replacement of outdoor sections of the isolated phase bus. The 7000A sections of the bus for Transformer Banks T1 will be replaced with 8000A sections. The work must include: a. Demolition of all existing bus work b. Installation of new bus work c. Perform all associa...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Bridgeport

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Road, Commercial, Water Supply and Storage

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project