Chief Joseph Dam Units 1-16 Excitation System Replace
Closed · Washington · Last reported Oct 2024
Source: Dodge USA
The scope of work for this contract consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of these specifications: a. Design, prepare drawings and data, manufacture, shop test, prepare and load for shipment, and deliver free on board destination 16 complete digital static
- Status
- Closed
- Sector
- Hydro, Power Generation (CCGT), Commercial, Water Supply and Storage, Residential, Manufacturing (Industrial)
- Location
- Bridgeport, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chief Joseph Dam Units 1-16 Excitation System Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for this contract consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of these specifications: a. Design, prepare drawings and data, manufacture, shop test, prepare and load for shipment, and deliver free on board destination 16 complete digital static excitation systems for the Chief Joseph Power Plant. b. Remove 16 existing excitation systems, t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bridgeport |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Commercial, Water Supply and Storage, Residential, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- I-90 Keechelus Dam to Stampede Pass Phase 2A
- I-90 Snowshed to Keechelus Dam Phase 1C
- BUSH FIELD - LOCK AND DAM ROAD
- SR 9 FM S OF BUFORD DAM RD TO PIRKLE FERRY RD
- Contract to revamp Anderson's Dam together with the Valley Water District, near two fault lines in Santa Clara County, California (United States)
- Intake works, construction of wells and conduction of the hydraulic circuit in the Chira and Soria dams, in Gran Canaria (Spain)
- CR 742/BASS ROAD FROM PROVIDENCE BLVD TO NEW FORSYTH ROAD
