Chief Joseph Dam Units 1-16 Excitation System Replace
Sector: Hydro • Location: Bridgeport, Washington, United States of America
Source: Dodge USA
The scope of work for this contract consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of these specifications: a. Design, prepare drawings and data, manufacture, shop test, prepare and load for shipment, and deliver free on board destination 16 complete digital static
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The scope of work for this contract consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of these specifications: a. Design, prepare drawings and data, manufacture, shop test, prepare and load for shipment, and deliver free on board destination 16 complete digital static excitation systems for the Chief Joseph Power Plant. b. Remove 16 existing excitation systems, t... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Hydro projects in United States of America
- Clearlake Affordable Housing Project
- Wichita & Affiliated Tribes Broadband Infrastructure Deployment Project and Broadband Use and Adoption Project
- Renovation of the potable water piping and distribution system from the Añarbe Dam to the Petritegi DWTP in Huesca (Spain)
- NEW SAVANNAH BLUFF LOCK & DAM REPAIR & RESTORATION - TIA
- INSTALL RCUT AT SR 515 & SR 325 (NOTELY DAM RD)
- Chabot Dam Upgrade
- Fiscal Year (FY) 2022 National Dam Safety Program (NDSP) - Region 8
- Fiscal Year (FY) 2019 National Dam Safety Program (NDSP) - Region 10
