logo

Chief William Commanda bridge multiuse pathway, active transportation improvements and rehabilitation

Sector: Steel • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

• The project will result in improved capacity and quality of pathways and/or active transportation infrastructure in Ottawa.The project involves constructing new active transportation infrastructure leading up to, and across, the Prince of Wales Bridge in Ottawa, Ontario. The addition of a timber deck on both the north and the south segments of the out-of-service rail bridge, as well as the const

Project Information FAQ

Project Information

4 Q
The project “Chief William Commanda bridge multiuse pathway, active transportation improvements and rehabilitation” is an infrastructure initiative in the Steel sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

• The project will result in improved capacity and quality of pathways and/or active transportation infrastructure in Ottawa.The project involves constructing new active transportation infrastructure leading up to, and across, the Prince of Wales Bridge in Ottawa, Ontario. The addition of a timber deck on both the north and the south segments of the out-of-service rail bridge, as well as the construction of multi-use path segments linking the north and south segments of the bridge across Lemieux Island and linking to existing active transportation networks on either side of the bridge, will create a multiuse active transportation connection between Ottawa and Gatineau. Work will also be undertaken to rehabilitate the deteriorated structure, substructure and superstructure of the bridge. The project scope includes: - Construction of a new elevated timber deck on top of rail track ties on both the south portion of the bridge (spanning from the Ottawa shore to Lemieux Island) and the north portion (structure spanning from Lemieux Island to the Gatineau shore); - Replacement of deteriorated rail track ties, installation of new timber encasements for track rails, and installation of a steel safety railing system; - Repairs to the bridge superstructure (floor beam replacement, rivet replacement with high-strength bolts, and portal frame angles replacement); - Rehabilitation of the bridge substructure; - Construction of three new multi-use path segments linking the south approach of the bridge to the City of Ottawa Trillium Pathway, linking the north and south bridge structures across Lemieux Island, and linking the north approach to the National Capital Commision (NCC) Voyageurs Pathway; - Installation of new lighting on the bridge and pathway; and - Installation of approximately 12 benches along the new pathway at the approaches and on Lemieux Island to comply with accessibility requirements. • The project will result in improved capacity and quality of pathways and/or active transportation infrastructure in Ottawa.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data