Chiem Hoa HPP
Sector: Hydro • Location: Vietnam
Source: World Bank Group
International Investment Construction and Trading JSC, a local developer, was planning the development of the 48 MW Chiem Hoa hydropower plant, as an independent power producer, located at Ngoc Hoi, Chiem Hoa dristrict, Tuyen Quang. The project was to comprise of 3 turbines, run-of-river.
Construction started in October 2009, and was expected to be completed in October 2012. The plant was design
- Status
- Prospective
- Sector
- Hydro, Wind, Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial
- Location
- Vietnam
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Chiem Hoa HPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | International Investment Construction and Trading JSC, a local developer, was planning the development of the 48 MW Chiem Hoa hydropower plant, as an independent power producer, located at Ngoc Hoi, Chiem Hoa dristrict, Tuyen Quang. The project was to comprise of 3 turbines, run-of-river. Construction started in October 2009, and was expected to be completed in October 2012. The plant was designed by Guangxi Electric Power Industry Investigation Design and Research Institute, from China. The project was also supplied by Chinese equipment. Total cost was estimated at VND1,700 billion (US$82 million). No further information about financing was available. The financial clsoure date was reported as July 2010, or 25% of construction period. The remaining two turbines were to be commissioned in October 2012. The project applied for UNFCCC CDM funding, and the credits were bought by Swiss-based Vitol. August 2012: it was reported that the first turbine of the project became operational on July 9th 2012. The total project was to consist of 3 turbines. Source: First turbine of 48 MW Vietnam HPP kicks off operation, SeeNews Renewables, 9 July 2012 |
Original sector | Energy |
Budget |
Location
Country | Vietnam |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Wind, Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial |
Article published date | 2024-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
