Chilca – La Planicie - Zapallal Transmission Line
One of 8,575 projects Taiyo tracks in Peru.
Source: World Bank Group
In June 2008, Transmantaro, owned by Colombian companies Interconexion Electrica S.A. E.S.P (ISA, 60%) and Empresa de Energía de Bogota S.A. E.S.P (EEB, 40%), was awarded the BOT contract for the Chilca – La Planicie - Zapallal Transmission Line at a tender organized by state investment promotion agency ProInversion. The line consisted of 300km of 500kV and 220kV line as well as three substations.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government, Commercial
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Chilca – La Planicie - Zapallal Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In June 2008, Transmantaro, owned by Colombian companies Interconexion Electrica S.A. E.S.P (ISA, 60%) and Empresa de Energía de Bogota S.A. E.S.P (EEB, 40%), was awarded the BOT contract for the Chilca – La Planicie - Zapallal Transmission Line at a tender organized by state investment promotion agency ProInversion. The line consisted of 300km of 500kV and 220kV line as well as three substations. ISA's US $55.2 million bid (33.7 mln euro) bid outbid Spanish Isonor Transmision and Peruvian Abengoa Peru. The value of the bid was calculated using a formula that took into account the cost of investment, operation and maitenance, construction timeline and the percentage of state subsidy required. Construction of the US $130 million project was 66% complete as of June 2010. The line was to strengthen the transmission system that connects Chilca district in Lima region with the national grid given new gas-fired thermo plants south of the capital. The line was also to transport power from the Platanal hydroelectric plant. The project became operational in March 2011. |
Original sector | Energy |
Budget |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project