Chilca – La Planicie - Zapallal Transmission Line

Sector: Power Generation (CCGT) • Location: Peru

Source: World Bank Group

Project
Active

In June 2008, Transmantaro, owned by Colombian companies Interconexion Electrica S.A. E.S.P (ISA, 60%) and Empresa de Energía de Bogota S.A. E.S.P (EEB, 40%), was awarded the BOT contract for the Chilca – La Planicie - Zapallal Transmission Line at a tender organized by state investment promotion agency ProInversion. The line consisted of 300km of 500kV and 220kV line as well as three substations.

Project Information FAQ

Project Information

4 Q
The project “Chilca – La Planicie - Zapallal Transmission Line” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In June 2008, Transmantaro, owned by Colombian companies Interconexion Electrica S.A. E.S.P (ISA, 60%) and Empresa de Energía de Bogota S.A. E.S.P (EEB, 40%), was awarded the BOT contract for the Chilca – La Planicie - Zapallal Transmission Line at a tender organized by state investment promotion agency ProInversion. The line consisted of 300km of 500kV and 220kV line as well as three substations. ISA's US $55.2 million bid (33.7 mln euro) bid outbid Spanish Isonor Transmision and Peruvian Abengoa Peru. The value of the bid was calculated using a formula that took into account the cost of investment, operation and maitenance, construction timeline and the percentage of state subsidy required. Construction of the US $130 million project was 66% complete as of June 2010. The line was to strengthen the transmission system that connects Chilca district in Lima region with the national grid given new gas-fired thermo plants south of the capital. The line was also to transport power from the Platanal hydroelectric plant. The project became operational in March 2011.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data