logo

Childress Data Center Campus Expansion

Sector: Power Generation (CCGT) • Location: Childress, Texas, United States

Source: KFDA | NewsChannel 10

Project
Under Construction

IREN is continuing to develop its data center campus in Childress, Texas. The project includes constructing 200 megawatts of computing power for Microsoft, adding 100 megawatts of new liquid-cooled data centers, and retrofitting another 250 megawatts of existing capacity for state-of-the-art chips. The facility uses a closed-loop cooling system that minimizes water consumption and sources water ex

Status
Under Construction
Sector
Power Generation (CCGT), Water Supply and Storage, Data Center
Location
Childress, Texas, United States of America
Updated
22 Jul 2026
Source
KFDA | NewsChannel 10

ConstructChat

Ask ConstructChat about Childress Data Center Campus Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Childress Data Center Campus Expansion” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Childress, Texas, United States. Taiyo aggregates data on it from KFDA | NewsChannel 10.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IREN is continuing to develop its data center campus in Childress, Texas. The project includes constructing 200 megawatts of computing power for Microsoft, adding 100 megawatts of new liquid-cooled data centers, and retrofitting another 250 megawatts of existing capacity for state-of-the-art chips. The facility uses a closed-loop cooling system that minimizes water consumption and sources water externally to avoid impacting local supplies.

Original sector

Data Center

Location

Country

United States of America (USA)

State

Texas

City

Childress

Source

Source

KFDA | NewsChannel 10

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Data Center

Article published date

2026-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project