logo

Chilime Sanjen HPP

Sector: Hydro • Location: Nepal

Source: World Bank Group

Project
Active

Sanjen Jalavidhyut Company Limited (SJCL), subsidiary of Chilime Hydropower Company Limited (CHCL) was planning the development of the 42.5MW Sanjen Hydroelectric Project (SHEP) and the 14.5MW Sanjen-Upper Hydroelectric Project (SUHEP). Chilime was 51% owned by Nepal Electricity Authority.

The project equity structure was as follows: Chilime Hydropower Company: 38% Nepal Electricity Authority: 10

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Commercial
Location
Nepal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Chilime Sanjen HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Chilime Sanjen HPP” is an infrastructure initiative in the Hydro sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sanjen Jalavidhyut Company Limited (SJCL), subsidiary of Chilime Hydropower Company Limited (CHCL) was planning the development of the 42.5MW Sanjen Hydroelectric Project (SHEP) and the 14.5MW Sanjen-Upper Hydroelectric Project (SUHEP). Chilime was 51% owned by Nepal Electricity Authority. The project equity structure was as follows: Chilime Hydropower Company: 38% Nepal Electricity Authority: 10% Employees: 4.5% Contributors of Employee Fund: 19.5% Project affected people: 10% General Public: 15% The SUHEP project consisted of 3 Francis turbines of 5.1MW, and a 5km 132kv transmission line. The SHEP projet consisted of Pelton Vertical Axis turbines (3x) of 14.75MW each, and 1.2km of 132kV transmission. The project signed a PPA in October 2011 (SUHEP) and December 2011 (SHEP). Commercial operation was expected for December 2015. Generation license was valid for 35 years, from November 2012. The EIA was approved by Ministry of Environment. Civil construction contract was under bid, as well as hydroelectric works. Debt was to be provided by the EPF, for wich a tri-partite loan agreement was signed in 8 December 2011. Total project cost was unknown, but estimated at US$11.5 million per MW (average for SAR). http://www.chilime.com.np/sanjen.html

Original sector

Energy

Budget

Location

Country

Nepal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project