China - Renewable Energy Scale-up Program (CRESP)
Sector: Power Generation (CCGT) • Location: China
Source: World Bank Group
The Renewable Energy Scale-up program for China aims to create a legal, regulatory, and institutional environment conducive to large-scale, renewable-based electricity generation, and to demonstrate early success in large-scale, renewable energy development with participating local developers in two provinces. The Project has the following components: The Institutional Development and Capacity Bui
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Renewable Energy Scale-up program for China aims to create a legal, regulatory, and institutional environment conducive to large-scale, renewable-based electricity generation, and to demonstrate early success in large-scale, renewable energy development with participating local developers in two provinces. The Project has the following components: The Institutional Development and Capacity Building component was designed to meet national priorities and the needs of the pilot provinces to initiate the scale-up of renewable energy, and will include the following: Mandated Market Policy MMP research and implementation support; technology improvement for wind and biomass; and long-term capacity building. Two subcomponents, one for Fujian Province and one for Rudong Province, are submitted for Board approval. In Fujian, a 100 MW wind farm at Changjiang'ao, Pingtan Island. The Pingtan wind farm will consist of wind turbines, associated civil and electrical works, an extension to an existing control room, a switchyard, and a 15 km, 110 kV transmission line from the wind farm to the Beicuo substation, which will be upgraded to meet the evacuation needs of the wind farm. In Jiangsu, a 25 MW straw-fired biomass power plant at Mabei Village, Rudong County. The Rudong power plant will consist of one 110 ton per hour, high-temperature, high-pressure strawfired boiler, one 25 MW steam turbine, and associated mechanical, electrical, and civil works. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
