logo

China - Renewable Energy Scale-up Program (CRESP)

Sector: Power Generation (CCGT) • Location: China

Source: World Bank Group

Project
Closed

The Renewable Energy Scale-up program for China aims to create a legal, regulatory, and institutional environment conducive to large-scale, renewable-based electricity generation, and to demonstrate early success in large-scale, renewable energy development with participating local developers in two provinces. The Project has the following components: The Institutional Development and Capacity Bui

Project Information FAQ

Project Information

5 Q
The project “China - Renewable Energy Scale-up Program (CRESP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Renewable Energy Scale-up program for China aims to create a legal, regulatory, and institutional environment conducive to large-scale, renewable-based electricity generation, and to demonstrate early success in large-scale, renewable energy development with participating local developers in two provinces. The Project has the following components: The Institutional Development and Capacity Building component was designed to meet national priorities and the needs of the pilot provinces to initiate the scale-up of renewable energy, and will include the following: Mandated Market Policy MMP research and implementation support; technology improvement for wind and biomass; and long-term capacity building. Two subcomponents, one for Fujian Province and one for Rudong Province, are submitted for Board approval. In Fujian, a 100 MW wind farm at Changjiang'ao, Pingtan Island. The Pingtan wind farm will consist of wind turbines, associated civil and electrical works, an extension to an existing control room, a switchyard, and a 15 km, 110 kV transmission line from the wind farm to the Beicuo substation, which will be upgraded to meet the evacuation needs of the wind farm. In Jiangsu, a 25 MW straw-fired biomass power plant at Mabei Village, Rudong County. The Rudong power plant will consist of one 110 ton per hour, high-temperature, high-pressure strawfired boiler, one 25 MW steam turbine, and associated mechanical, electrical, and civil works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data