The Renewable Energy Scale-up program for China aims to create a legal, regulatory, and institutional environment conducive to large-scale, renewable-based electricity generation, and to demonstrate early success in large-scale, renewable energy development with participating local developers in two provinces. The Project has the following components: The Institutional Development and Capacity Bui

Status
Closed
Sector
Power Generation (CCGT), Biomass, Wind, Raw Materials, Government, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about China - Renewable Energy Scale-up Program (CRESP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “China - Renewable Energy Scale-up Program (CRESP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in China. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Renewable Energy Scale-up program for China aims to create a legal, regulatory, and institutional environment conducive to large-scale, renewable-based electricity generation, and to demonstrate early success in large-scale, renewable energy development with participating local developers in two provinces. The Project has the following components: The Institutional Development and Capacity Building component was designed to meet national priorities and the needs of the pilot provinces to initiate the scale-up of renewable energy, and will include the following: Mandated Market Policy MMP research and implementation support; technology improvement for wind and biomass; and long-term capacity building. Two subcomponents, one for Fujian Province and one for Rudong Province, are submitted for Board approval. In Fujian, a 100 MW wind farm at Changjiang'ao, Pingtan Island. The Pingtan wind farm will consist of wind turbines, associated civil and electrical works, an extension to an existing control room, a switchyard, and a 15 km, 110 kV transmission line from the wind farm to the Beicuo substation, which will be upgraded to meet the evacuation needs of the wind farm. In Jiangsu, a 25 MW straw-fired biomass power plant at Mabei Village, Rudong County. The Rudong power plant will consist of one 110 ton per hour, high-temperature, high-pressure strawfired boiler, one 25 MW steam turbine, and associated mechanical, electrical, and civil works.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

China

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Biomass, Wind, Raw Materials, Government, Commercial

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project