China: Anhui Shaying River Channel Improvement Project
Sector: Road • Location: China
Source: World Bank
The development objective of the Anhui Shaying River Channel Improvement Project for China is to contribute to the increased cargo throughput of the Shaying River in Anhui Province through infrastructure improvements and capacity building. There are four components to the project. The first component of the project is navigation infrastructure and facilities. This component includes river channeli
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the Anhui Shaying River Channel Improvement Project for China is to contribute to the increased cargo throughput of the Shaying River in Anhui Province through infrastructure improvements and capacity building. There are four components to the project. The first component of the project is navigation infrastructure and facilities. This component includes river channelization and dredging works, river bank strengthening and protection works, and provision of navigation aids and service facilities. The second component of the project is reconstruction and relocation of existing infrastructure and facilities. This component includes reconstruction and reinforcement of existing cross-river bridges that have insufficient clearance and relocation of other existing cross-river facilities that impede navigation. The third component of the project is erection of waterway transport management systems. This component includes provision and installation of the plants and equipment which are needed for building the management systems to be developed by the two technical studies under component four. The fourth component of the project is technical assistance. This component includes technical studies and training programs that are designed to build the institutional capacity of the Inland Waterway Transport (IWT) sector to enable sustainable IWT development in Anhui Province. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
