logo

China Fusion Engineering Test Reactor (CFETR)

Sector: Nuclear • Location: Hefei, Anhui, China

Source: Table.Briefings

Project
Planned

The CFETR is a planned nuclear fusion power plant prototype intended to prove the practicality of fusion energy. It is expected to have a maximum output of 2 gigawatts and is scheduled to be operational by 2035 after overcoming several technical hurdles.

Status
Prospective
Sector
Nuclear, Power Generation (CCGT)
Location
Hefei, Anhui, China
Updated
22 Jul 2026
Source
Table.Briefings

ConstructChat

Ask ConstructChat about China Fusion Engineering Test Reactor (CFETR)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “China Fusion Engineering Test Reactor (CFETR)” is an infrastructure initiative in the Nuclear sector, located in Hefei, Anhui, China. Taiyo aggregates data on it from Table.Briefings.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The CFETR is a planned nuclear fusion power plant prototype intended to prove the practicality of fusion energy. It is expected to have a maximum output of 2 gigawatts and is scheduled to be operational by 2035 after overcoming several technical hurdles.

Original sector

Energy

Location

Country

China

State

Anhui

City

Hefei

Source

Source

Table.Briefings

URL

More Details

Record type

Project

Sector

Nuclear, Power Generation (CCGT)

Article published date

2025-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project