logo
ProjectClosed

China: Gansu Qingyang Urban Infrastructure Improvement Project

One of 10,000+ projects Taiyo tracks in China.

Source: World Bank

The development objective of the Gansu Qingyang Urban Infrastructure Improvement Project for China is to assist Qingyang Municipality to improve selected urban infrastructure services including urban roads and urban environmental services. There are two components to the project. The first component is urban infrastructure improvements. This component includes the following subcomponents: 1) urban

Status
Closed
Sector
Mass Transit, Road, Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Waste Processing and Treatment, Forest Products and Packaging, Power Generation (CCGT), Raw Materials, Government, Car parking, Education, Commercial, Automotive
Location
China
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about China: Gansu Qingyang Urban Infrastructure Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “China: Gansu Qingyang Urban Infrastructure Improvement Project” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Gansu Qingyang Urban Infrastructure Improvement Project for China is to assist Qingyang Municipality to improve selected urban infrastructure services including urban roads and urban environmental services. There are two components to the project. The first component is urban infrastructure improvements. This component includes the following subcomponents: 1) urban bypass. This sub-component includes (i) construction of bypass roads of the southern section of Xifeng's West Ring Road and the northern section of Xifeng's East Ring Road with installation of associated pipes; (ii) construction of three connection roads to the two bypass corridors of West Ring Road and East Ring Road; 2) integrated road corridor. This sub-component includes: (i) improvement of three selected main road corridors (Nan Bei Street, Anding Dong Xi Road, West Ring Road), including road pavement, traffic channelization, and lighting and greening, along with drainage and sewage system improvements; (ii) rehabilitation of three selected backstreets and small lanes for slow traffic (Nanyuan, Tianhe and Xifeng lanes); and (iii) carrying out, as part of the design of the integrated road corridor, the parking action plan, the public transport action plan, and the traffic safety, education and enforcement action plan; 3) drainage and sewage; and 4) wastewater treatment plant. The second component is institutional strengthening and capacity building. This component includes: provision of technical assistance for: (a) carrying out of a water resource study covering, among others, for water reuse, sub-basin water environment improvements and industrial wastewater discharge licenses in Xifeng District that supports the ongoing investments of wastewater management; (b) the improvement of the operation and maintenance capabilities of Qingyang Municipal Water Supply and Sewage Company (QWSSC) and Xifeng District's Public Utility and Transportation Bureaus in the provision of urban infrastructure services in the key sectors of drainage and wastewater, urban road transport; (c) capacity building and training for Qingyang Municipality's and Xifeng District's agencies involved in project implementation; and (d) strengthening of QWSSC's GIS-based system for the management of its drainage and wastewater pipes networks; and (e) strengthening the Qingyang Municipality's capacity for project management and construction supervision of the project.

Original sector

FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Waste Processing and Treatment, Forest Products and Packaging, Power Generation (CCGT), Raw Materials, Government, Car parking, Education, Commercial, Automotive

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project