China: Guangxi Chongzuo Border Connectivity Improvement Project

One of 10,000+ projects Taiyo tracks in China.

Source: Asian Infrastructure Investment Bank (AIIB)

Component A: Construction of the last section of the Wuzhou - Shuolong Expressway with a total length of 17.679 km, starting from the Neitun Interchange, which is the crossing point with the existing Chongzuo-Jingxi Expressway, and ending at the Shuolong dry port bordered with Viet Nam. Component B: Improvement of an existing border road with a length of 13.632 km connecting Shuolong dry port to t

Status
Prospective
Sector
Water Supply and Storage, Road, Biomass, Seaport, Hotel, Commercial, Waste Processing and Treatment, Government, Car parking, Residential, Automotive
Location
China
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about China: Guangxi Chongzuo Border Connectivity Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “China: Guangxi Chongzuo Border Connectivity Improvement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Company

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Component A: Construction of the last section of the Wuzhou - Shuolong Expressway with a total length of 17.679 km, starting from the Neitun Interchange, which is the crossing point with the existing Chongzuo-Jingxi Expressway, and ending at the Shuolong dry port bordered with Viet Nam. Component B: Improvement of an existing border road with a length of 13.632 km connecting Shuolong dry port to the Detian (Pan Gioc) Waterfall scenic spot, which is a Cross-border Tourism Cooperation Zone. Component C: Construction of the Shuolong dry port (Shuolong Main Gate-Phase 2), including the approaching road, parking space, inspection service buildings and relevant facilities and landscaping at the Shuolong Main Gate. Component D: Technical support and project management, including the pilot-based Infrastructure Technology (Infratech) application in the project to improve the asset management across the infrastructure lifecycle, and the required consulting service and capacity building to enhance the project implementation.

Original sector

Transport

Budget

Location

Country

China

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Biomass, Seaport, Hotel, Commercial, Waste Processing and Treatment, Government, Car parking, Residential, Automotive

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project