logo

China-Laos 500 kV Power Grid Interconnection Project

Sector: Power Generation (CCGT) • Location: Vientiane, Laos

Source: Malaysia Sun

Project
Completed

A power grid interconnection project linking China and Laos with a 500 kV power line to boost power connectivity and mutual support capacity between the two countries.

Status
Closed
Sector
Power Generation (CCGT)
Location
Vientiane, Laos
Updated
22 Jul 2026
Source
Malaysia Sun

ConstructChat

Ask ConstructChat about China-Laos 500 kV Power Grid Interconnection Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “China-Laos 500 kV Power Grid Interconnection Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Vientiane, Laos. Taiyo aggregates data on it from Malaysia Sun.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A power grid interconnection project linking China and Laos with a 500 kV power line to boost power connectivity and mutual support capacity between the two countries.

Original sector

Energy

Location

Country

Laos

City

Vientiane

Source

Source

Malaysia Sun

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-04-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project