logo

China: Nanchang Urban Rail Project

Sector: Mass Transit • Location: China

Source: World Bank

Project
Closed

The development objective of the Nanchang Urban Rail Project for China is to provide an effective urban mass rapid transit system of appropriate quality along the line 2 corridor from ZhanQianNanDaDao Station to XinJiaAn station. The project had four components. The first component is construction of line 2. This component includes all construction activities for the urban rail line 2 (about 23.78

Project Information FAQ

Project Information

5 Q
The project “China: Nanchang Urban Rail Project” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Nanchang Urban Rail Project for China is to provide an effective urban mass rapid transit system of appropriate quality along the line 2 corridor from ZhanQianNanDaDao Station to XinJiaAn station. The project had four components. The first component is construction of line 2. This component includes all construction activities for the urban rail line 2 (about 23.78km). Line 2 will connect western and eastern Nanchang. It will start from the Line 2 depot, go through the ZhanQianNanDaDao Station in southwest Nanchang, run along the west bank of the Gan river, up to Chunhui road, then move east under the Gan river onto Yangming road and turn south to XinJiaAn station in southeast Nanchang. Line 2 includes 21 stations, which will all be located underground and connected by tunnels. The second component is equipment for line 2. This component includes all the equipment necessary to the successful operation of line 2 such as rolling stock, power supply, control system, signaling system, communication system, monitoring system, fare collection system, safety and security system, ventilation and air conditioning system, water supply, sewerage and fire protection system, and station auxiliary equipment. The third component is design, construction management and technical assistance. This component includes the following activities: (i) design and preparation of the project; (ii) construction management and quality assurance; and (iii) technical assistance and capacity building to relevant staff in Nanchang Municipality (NM) and the Urban Rail Company (URC) to take steps to improve ridership levels (ridership modeling, scenario testing, fare integration), to increase land value around stations, and to improve financial management and internal audit functions for the Nanchang URC. The fourth component is safeguards and other construction costs. This component will include the land acquisition and resettlement costs, construction site preparation (environmental mitigation measures) as well as other project related construction costs such as engineering.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data