logo
ProjectClosed

China: Nanchang Urban Rail Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank

The development objective of the Nanchang Urban Rail Project for China is to provide an effective urban mass rapid transit system of appropriate quality along the line 2 corridor from ZhanQianNanDaDao Station to XinJiaAn station. The project had four components. The first component is construction of line 2. This component includes all construction activities for the urban rail line 2 (about 23.78

Status
Closed
Sector
Mass Transit, Road, Water Supply and Storage, Rail, Power Generation (CCGT), Forest Products and Packaging, Commercial, Government, Automotive
Location
China
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about China: Nanchang Urban Rail Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “China: Nanchang Urban Rail Project” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Nanchang Urban Rail Project for China is to provide an effective urban mass rapid transit system of appropriate quality along the line 2 corridor from ZhanQianNanDaDao Station to XinJiaAn station. The project had four components. The first component is construction of line 2. This component includes all construction activities for the urban rail line 2 (about 23.78km). Line 2 will connect western and eastern Nanchang. It will start from the Line 2 depot, go through the ZhanQianNanDaDao Station in southwest Nanchang, run along the west bank of the Gan river, up to Chunhui road, then move east under the Gan river onto Yangming road and turn south to XinJiaAn station in southeast Nanchang. Line 2 includes 21 stations, which will all be located underground and connected by tunnels. The second component is equipment for line 2. This component includes all the equipment necessary to the successful operation of line 2 such as rolling stock, power supply, control system, signaling system, communication system, monitoring system, fare collection system, safety and security system, ventilation and air conditioning system, water supply, sewerage and fire protection system, and station auxiliary equipment. The third component is design, construction management and technical assistance. This component includes the following activities: (i) design and preparation of the project; (ii) construction management and quality assurance; and (iii) technical assistance and capacity building to relevant staff in Nanchang Municipality (NM) and the Urban Rail Company (URC) to take steps to improve ridership levels (ridership modeling, scenario testing, fare integration), to increase land value around stations, and to improve financial management and internal audit functions for the Nanchang URC. The fourth component is safeguards and other construction costs. This component will include the land acquisition and resettlement costs, construction site preparation (environmental mitigation measures) as well as other project related construction costs such as engineering.

Original sector

FY17 - Transportation

Budget

Location

Country

China

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Water Supply and Storage, Rail, Power Generation (CCGT), Forest Products and Packaging, Commercial, Government, Automotive

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project