logo

China Power Hub Generation Company

Sector: Power Generation (CCGT) • Location: Pakistan

Source: World Bank Group

Project
Active

The project entails the development, construction and operation of 2×660 MW Coal-fired Power Plant in Hub, Balochistan, near the existing HUBCO’s RFO power plant. During commercial operations, the project will provide 9 billion kWh electricity to the National Grid every year that will meet the electricity needs of 4 million households in Pakistan.

China Power Hub Generation Company is a joint-ven

Status
Prospective
Sector
Power Generation (CCGT), Bridge, Seaport, Government, Manufacturing (Industrial), Commercial
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about China Power Hub Generation Company

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “China Power Hub Generation Company” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the development, construction and operation of 2×660 MW Coal-fired Power Plant in Hub, Balochistan, near the existing HUBCO’s RFO power plant. During commercial operations, the project will provide 9 billion kWh electricity to the National Grid every year that will meet the electricity needs of 4 million households in Pakistan. China Power Hub Generation Company is a joint-venture between China Power International Holding (74%) and Hub Power Company (26%). The groundbreaking ceremony of the project was held in March 2017 and since then CPIH has provided $300 million as shareholder loan to pay for project construction. Total investment is estimated at $1,940 million. The debt-to-equity ratio on the power plant is approximately 77:23. Debt financing is provided by a consortium of Chinese banks comprising: China Development Bank, Exim Bank of China, Industrial Bank of China, China Construction Bank, Bank of Communications. Total amount of debt funding is $1.5 billion. Financial closure occurred on 30 October 2017. CPHGC has selected two of the industry’s most powerful enterprises in China as its EPC contractors. They are NWEPDI (North West Electric Power Design Institute) & TEPC (Tianjin Electric Power Construction) Consortium for power plant EPC, and CHEC (China Harbor Engineering Company Ltd.) for Jetty EPC, the later one has operated in Pakistan for the last 20 years. The fuel of the project will be imported coal from South Africa and Indonesia. The jetty and the coal transhipment facility which are under construction will be able to provide up to 4.3 MTPA of coal to the plant. The jetty will be connected to the shoreline through a trestle and causeway. Expected Commercial Operation Date (COD) for the first unit of 660-MW is December 2018, and for the second unit of 660-MW August 2019. https://www.brecorder.com/2017/10/30/377649/cphgc-signs-1-5bn-foreign-financing-agreement-with-chinese-lending-consortium/ http://fossilfuel.energy-business-review.com/news/cphgc-set-to-commence-construction-of-1320mw-coal-fired-power-plant-in-pakistan-220317-5768969 https://www.dawn.com/news/1321768

Original sector

Energy

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Bridge, Seaport, Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project