logo

China Resources Power Shandong Caoxian 481.25MW wind power project

Sector: Geothermal • Location: China

Source: World Bank Group

Project
Active

The project comprises the construction of Shandong Caoxian 481.25MW wind powerbase, located in Cao County, Shandong Province, China and sponsored by China Resources Power. Construction started in December 2024. It will install and construct 77 6.25-MW wind turbines and simultaneously build two 220 kV substations, with a total investment of approximately $361.5m 2.63 billion yuan, coming from the s

Project Information FAQ

Project Information

4 Q
The project “China Resources Power Shandong Caoxian 481.25MW wind power project” is an infrastructure initiative in the Geothermal sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction of Shandong Caoxian 481.25MW wind powerbase, located in Cao County, Shandong Province, China and sponsored by China Resources Power. Construction started in December 2024. It will install and construct 77 6.25-MW wind turbines and simultaneously build two 220 kV substations, with a total investment of approximately $361.5m 2.63 billion yuan, coming from the sponsor's budget, as the debt/equity ratio is not disclosed. The project is expected to generate 1.147 billion kWh of electricity annually, with wind turbine utilization hours of about 2,772 hours. Compared with conventional coal-fired thermal power units with the same power generation, it can save 348,300 tons of standard coal, reduce carbon dioxide emissions by 956,600 tons, and smoke by 254,200 tons each year. After completion, the project will further optimize the energy structure of Heze City. https://wind.imarine.cn/news/107075.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data