logo

China-Second Liaoning Medium Cities Infrastructure Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Closed

The development objective of the Second Liaoning Medium Cities Infrastructure Project is to improve the performance and sustainability of water supply, wastewater, and solid waste services in the Second Liaoning Medium Cities Infrastructure Project (LMC-2) cities. Enhanced wastewater and solid waste services will also help reduce pollution into the Bohai Sea and contribute to improving Bohai Sea w

Project Information FAQ

Project Information

5 Q
The project “China-Second Liaoning Medium Cities Infrastructure Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Second Liaoning Medium Cities Infrastructure Project is to improve the performance and sustainability of water supply, wastewater, and solid waste services in the Second Liaoning Medium Cities Infrastructure Project (LMC-2) cities. Enhanced wastewater and solid waste services will also help reduce pollution into the Bohai Sea and contribute to improving Bohai Sea water quality. There are 4 components to the Project. Project Ref: PAD B.3, Technical Annex 4Component 1, Wastewater Infrastructure, covers four cities and includes the construction of new and rehabilitated wastewater collection systems in all four cities; the construction of new wastewater treatment plants in Yingkou, Panjin, and Gaizhou; andthe construction of river embankment works in Fushun. Component 2, Water Supply Infrastructure, covers six cities and includes the renovation of water distribution pipelines in all cities; installing around 200,000 water supply meters; upgrading treatment plants in Anshan and Haicheng; and the construction of a new water treatment plant and transmission lines in Yingkou. Component 3, Solid Waste Infrastructure, includes the construction of new sanitary landfills in all three cities; closure of existing open dumps in Fushun and Yingkou EDZ; and solid waste collection and transfer works and equipment. Component 4, Institutional Development, covers the following activities: i) Design and Construction Technical Assistance; ii) Public Utility Improvement Program; iii) Solid Waste Master Planning; and iv) Water Pollution Control Planning. The last three items will be funded through the GEF grant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data