Typically, CWP develops new projects through a wholly or partially held subsidiary or a special purpose vehicle (“SPV”). However, CWP also through its subsidiary companies, is involved in EPC, construction and O&M of wind power projects for other wind power project developers. CWP has been awarded and is implementing the 8th Ganhekou Wind Farm (201MW) project. The 8th Ganhekou Project will be impl
- Status
- Closed
- Sector
- Raw Materials, Residential, Road, Water Supply and Storage, Wind, Steel, Government, Cement, Warehouse, Power Generation (CCGT), Oil and Gas, Car parking, Commercial, Metal, Automotive
- Location
- China
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about China WindPower
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Typically, CWP develops new projects through a wholly or partially held subsidiary or a special purpose vehicle (“SPV”). However, CWP also through its subsidiary companies, is involved in EPC, construction and O&M of wind power projects for other wind power project developers. CWP has been awarded and is implementing the 8th Ganhekou Wind Farm (201MW) project. The 8th Ganhekou Project will be implemented by Gansu Guazhou Xiehe Wind Power Co. Ltd , a project SPV which is a subsidiary of CWP. IFC is proposing providing a loan the Project Company and is also considering an equity investment in CWP.The 8th Ganhekou Project involves installation of 134 wind turbine generators (WTGs), resulting in a total rated output for the project of 201 MW. The turbines will be set in a 6-lines quincunx form (north-south as columns and east-west as rows), with a 9D row spacing and a 6D column spacing (D is the rotor diameter). The output voltage of the wind turbines is 690V, each of which will have a dedicated transformer to step up the voltage to 35 kV. The power from the WTGs will be collected/fed to a 330 kV substation mainly on 35kV overhead lines with cable connections where necessary. The 330 kV substation will be constructed by a third party but will also serve two other wind power projects. The power generated by this wind farm will be connected via 12 - 35kV loops to a 330kV step-up transformer station, after which the power will be connected as 1 loop 330kV to the proposed 750kV Transformer Station via a 6.9km underground line for integration into the regional Grid. Additionally, the 8th Ganhekou Project will also include a monitoring center which will include buildings for auxiliary production and offices including a control room, a first power-distribution room, a secondary cabinet room, office rooms, a rest lounge, meeting rooms, operating rooms, a canteen, an oil warehouse, tool houses, spare parts warehouses and a garage. Underground reinforced steel concrete water pump station, fire-fighting water tank and living/domestic use water tank are proposed.The 8th Ganhekou Project is located in Gobi desert, 56.5 km northwest of Guazhou County of Jiuquan, in the Gansu province, China. The Project is located in a flat desert area. The wind farm site is rectangular in shape 8 km long (north-south) and 5 km wide (east to west) with a total area of 40 km2. Within this total area, the project footprint will be 431,925 m2 of land for wind turbines, box-type transformers, monitor center, cables buried and permanent roads etc. |
Original sector | BC - Wind Power - Renewable Energy Generation |
Location
Country | China |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Residential, Road, Water Supply and Storage, Wind, Steel, Government, Cement, Warehouse, Power Generation (CCGT), Oil and Gas, Car parking, Commercial, Metal, Automotive |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project