China–Russia Lunar Nuclear Power Station (ILRS Energy Module)
Sector: Power Generation (CCGT)
Source: Construction Review
A lunar nuclear energy infrastructure project in early conceptual and planning phase, aimed at supporting the International Lunar Research Station (ILRS) with sustained scientific operations and robotic infrastructure on the Moon. The project targets deployment near the Moon's South Pole by 2035-2036, involving autonomous robotic installation and focusing on space nuclear fission power systems.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Aerospace & Defense, Nuclear, Commercial
- Updated
- 22 Jul 2026
- Source
- Construction Review
ConstructChat
Ask ConstructChat about China–Russia Lunar Nuclear Power Station (ILRS Energy Module)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning and feasibility study phase |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A lunar nuclear energy infrastructure project in early conceptual and planning phase, aimed at supporting the International Lunar Research Station (ILRS) with sustained scientific operations and robotic infrastructure on the Moon. The project targets deployment near the Moon's South Pole by 2035-2036, involving autonomous robotic installation and focusing on space nuclear fission power systems. |
Original sector | Energy |
Budget |
Location
| Not available for this record. |
Source
Source | Construction Review |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Aerospace & Defense, Nuclear, Commercial |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- Utility Underground District
- Plaza del Mar Band Shell Renovation Project
- West Field Cargo Redevelopment Facility Phase 1
- Citywide Slurry Seal Project
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
