Chiniki Solar Project
Planning schematics · Alberta · Last reported Apr 2024
Source: Dodge USA
Solar photovoltaic power generation facility - 25MW AC in Phase 1 - 15MW AC in Phase 2 - Designed to have a 30 year life - Project will involve the installation of solar photovoltaic panels and panel racking systems and internal access roads and cabling and electrical inverters and other related electrical equipment and connection to the transmission 138KV line
- Status
- Prospective
- Sector
- Solar, Telecommunications, Road, Power Generation (CCGT), Commercial
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chiniki Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Solar photovoltaic power generation facility - 25MW AC in Phase 1 - 15MW AC in Phase 2 - Designed to have a 30 year life - Project will involve the installation of solar photovoltaic panels and panel racking systems and internal access roads and cabling and electrical inverters and other related electrical equipment and connection to the transmission 138KV line |
Budget |
Location
Country | Canada |
State | Alberta |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Telecommunications, Road, Power Generation (CCGT), Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Canada
- Calgary Board of Education K-4 School Bundle
- Acden Corporate Headquarters and Fleet Facility
- Bluenose Academy
- Brandon - Transit Shelters Lighting Project
- Grand Renewable Energy Park Haldimand County Ontario
- Sheridan College Hazel McCallion Campus (Phase 2)
- Solar System for Community Cultural Complex and Roundhouse
- Sol Aurora Solar Project
