Chippewa Falls West River Street Reconstruction
Sector: Water Supply and Storage • Location: Chippewa Falls, Wisconsin, United States of America
Source: Dodge
Major Quantities for the Work Include:21,000 SY Removing Concrete Pavement 18,800 CY Excavation Common 1,150 TON Base Aggregate Dense 3/4-inch 17,500 TON Base Aggregate Dense 1 1/4-inch 8,100 SY Concrete Pavement 8-inch 2,800 TON HMA Pavement 4 MT 58-28 S 1,310 TON HMA Pavement 4 MT 58-34 S 1,240 TON Asphaltic Surface Temporary 3,143 LF Concrete Curb & Gutter 30-inch Type A 2,380 LF Concrete Curb
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Road, Commercial, Waste Processing and Treatment
- Location
- Chippewa Falls, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Chippewa Falls West River Street Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major Quantities for the Work Include:21,000 SY Removing Concrete Pavement 18,800 CY Excavation Common 1,150 TON Base Aggregate Dense 3/4-inch 17,500 TON Base Aggregate Dense 1 1/4-inch 8,100 SY Concrete Pavement 8-inch 2,800 TON HMA Pavement 4 MT 58-28 S 1,310 TON HMA Pavement 4 MT 58-34 S 1,240 TON Asphaltic Surface Temporary 3,143 LF Concrete Curb & Gutter 30-inch Type A 2,380 LF Concrete Curb & Gutter 30-inch Type D 433 LF Storm Sewer Pipe Reinforced Concrete Class III 15-inch 365 LF Stor... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Chippewa Falls |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Road, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
