Chirayinkeezhu Railway Overbridge (ROB)
Sector: Rail • Location: Chirayinkeezhu, Kerala, India
Source: Times of India
The Chirayinkeezhu ROB project aims to construct a railway overbridge to improve connectivity across the Thiruvananthapuram-Kollam rail route. The project has faced delays due to departmental discord and utility shifting issues, with only 80% of the work completed as of now.
- Status
- Under Construction
- Sector
- Rail, Road, Mass Transit, Power Transmission, Power Generation (CCGT)
- Location
- Chirayinkeezhu, Kerala, India
- Updated
- 22 Jul 2026
- Source
- Times of India
ConstructChat
Ask ConstructChat about Chirayinkeezhu Railway Overbridge (ROB)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Chirayinkeezhu ROB project aims to construct a railway overbridge to improve connectivity across the Thiruvananthapuram-Kollam rail route. The project has faced delays due to departmental discord and utility shifting issues, with only 80% of the work completed as of now. |
Original sector | Transportation |
Location
Country | India |
State | Kerala |
City | Chirayinkeezhu |
Source
Source | Times of India |
URL |
More Details
Record type | Project |
Sector | Rail, Road, Mass Transit, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
