Chisinau Shopping Mall
Complete · Moldova
Source: European Bank for Reconstruction and Development (EBRD)
The project involves financing of a retail and entertainment complex with a gross build up area of 72,000 sq m. and gross letting area of 26,369 sq m. located 2 km south from the centre of Chisinau.
The Chisinau Shopping Mall has been developed, constructed, and is owned and operated by Lemi Invest SA, which is co-owned by S-L Real Estate Development BV and Colonnafin (jointly the ‘Sponsors’).
- Status
- Closed
- Sector
- Water Supply and Storage, Hotel, Government, Residential, Commercial, Manufacturing (Industrial)
- Location
- Moldova
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Chisinau Shopping Mall
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves financing of a retail and entertainment complex with a gross build up area of 72,000 sq m. and gross letting area of 26,369 sq m. located 2 km south from the centre of Chisinau. The Chisinau Shopping Mall has been developed, constructed, and is owned and operated by Lemi Invest SA, which is co-owned by S-L Real Estate Development BV and Colonnafin (jointly the ‘Sponsors’). The shopping mall is leased to reputable international and local tenants, many of which are already tenants in one of the Sponsor’s Bucharest shopping malls, which is developed and operated by Anchor Group SA. The project transition impact will derive from the following key areas: Lemi Invest SA, a special purpose company established under Moldovan law, which is equally co-owned by S-L Real Estate Development BV and Colonnafin BV. Both are Dutch companies. The latter is a Dutch Holding Company of which 100% is owned by Mr Husnu Ozyegin. EBRD is considering providing a senior debt of €42.8 million, equally distributed over an A- and B-loan. €56 million. 1. Screening category and justification B/1. requiring a site audit and an environmental analysis. The project has some specific environmental issues which can be readily addressed. 2. Due diligence undertaken and outcomes The environmental due diligence included the review of an Environmental Questionnaire for Property Project and communication to confirm that there were not any significant environmental issues to prevent the project to be further developed and that the site is suitable for the project purpose. A soil test was carried out on the site, and there are no soil contamination on the site; the geological survey did not identify any significant issues; the required zoning, planning and building permissions have been obtained. Waste water from the project will be discharged to the municipal sewerage systems and treated in the city’s waste water treatment plant; construction materials containing harmful substances such as asbestos and formaldehyde will not be used for the project; and some positive energy efficiency features such as automatic control of air-handling units, boilers, and cooling will be implemented. The Bank’s environmental staff visited the site in 2007 to confirm environmental and social mitigation measures were adequately in place and a further monitoring site visit was undertaken in 2011. 3. Implementation requirements An Environmental Action Plan (EAP) was developed and agreed for the project in order to monitor the implementation of adequate mitigation measures during project construction and operation. The project will be required to comply with national and EU environmental, health and safety standards and requirements, implement an EAP and submit an Annual Environmental Report to the Bank. The Bank will monitor the project’s environmental performance during the life of the project through a review of the Annual Environmental Report as well as monitoring visits. None. Mr Murat Kazaz Anchor Grup S.A. Anchor Plaza Office Building 12th Floor 26Z Timisoara Blvd. Bucharest 6 061331, Romania tel: +40 21 407 84 38 fax: +40 21 319 50 51 |
Original sector | Real Estate |
Location
Country | Moldova |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hotel, Government, Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Moldova
- Giurgiulesti International Free Port
- RED Union Fenosa S.A.
- Marine and River Litter Elimination New Approach
- Advanced nanotechnology-based approaches to waste water purification form organic pollutants and their monitoring in water bodies
- Development of water management in the Tuluceşti commune, Galati County and Sireţi commune, Străşeni district
- Pure Water – to the Benefit of Villagers
- The reduction of polution effects and soil erosion through the extension of management capacity of waste water
- CREATING A SYSTEM OF INNOVATIVE TRANSBOUNDARY MONITORING OF THE TRANSFORMATIONS OF THE BLACK SEA RIVER ECOSYSTEMS UNDER THE IMPACT OF HYDROPOWER DEVELOPMENT AND CLIMATE CHANGE
