Chittenango WWTP Clarifier Improvements
Sector: Waste Processing and Treatment • Location: Chittenango, New York, United States of America
Source: Dodge USA
Scope - The work generally consists of constructing, complete with all equipment, accessories, and appurtenances, the following at the Village of Chittenango WWTP. Replacement of the existing clarifier equipment and FRP weirs, launders, and scum baffles in two existing clarifier tanks. Replacement of an exhaust fan in each of the two existing clarifier domes. Washing and cleaning of the two existi
- Status
- Closed
- Sector
- Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Water Supply and Storage
- Location
- Chittenango, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chittenango WWTP Clarifier Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The work generally consists of constructing, complete with all equipment, accessories, and appurtenances, the following at the Village of Chittenango WWTP. Replacement of the existing clarifier equipment and FRP weirs, launders, and scum baffles in two existing clarifier tanks. Replacement of an exhaust fan in each of the two existing clarifier domes. Washing and cleaning of the two existing clarifier tanks and domes. Replacement of one existing influent screw pump. Replacement of thr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Chittenango |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Water Supply and Storage |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
