CHIVOR I HYDRO POWER

Closed · Colombia

Source: World Bank Group

Construction of the Chivor Hydroelectric Project will be the most suitable and economical means to meet the rapidly growing demand for energy. The project will be located about 120 km northeast of Bogota. It will have an ultimate capacity of about 1,000 MW. The proposed loan will help finance the first stage, of 500 MW which is to be started in 1970 and come into commercial operation in mid-1975.

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Tunnel, Commercial, Hydro, Government
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about CHIVOR I HYDRO POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CHIVOR I HYDRO POWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of the Chivor Hydroelectric Project will be the most suitable and economical means to meet the rapidly growing demand for energy. The project will be located about 120 km northeast of Bogota. It will have an ultimate capacity of about 1,000 MW. The proposed loan will help finance the first stage, of 500 MW which is to be started in 1970 and come into commercial operation in mid-1975. The annual generation of the plant in an average hydraulic year will be 3,477 GWh. The project will include a dam on the Bata River, a pressure tunnel and penstock, a powerhouse on the Lengupa River, and a 230 KV transmission line, 180 km long, to link the Chivor plant with the interconnection network.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Tunnel, Commercial, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project