Chlorination Building Upgrades
Sector: Waste Processing and Treatment • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The project consists of the construction of a new slab on grade building with a segregated chlorination storage area with separate entrance in order to eliminate safety concerns with the current confined space. The existing piping infrastructure will be upgraded and replaced and a new chlorination system will be installed which includes appropriate sized gas chlorinator with injectors, vacuum regu
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Chlorination Building Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the construction of a new slab on grade building with a segregated chlorination storage area with separate entrance in order to eliminate safety concerns with the current confined space. The existing piping infrastructure will be upgraded and replaced and a new chlorination system will be installed which includes appropriate sized gas chlorinator with injectors, vacuum regulators and automated switch over controls, cylinder scales, new gas detection system complete with both visual and audio alarms, proper building ventilation system, booster pumps and controls, flow meter and controller for data logging, and emergency shower/eye wash station. Project will also include all required ground work and landscaping, as well as the installation of fencing surrounding new building. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
