Chongqing Hongyan Village Bridge and Tunnel Project
Sector: Commercial • Location: China
Source: World Bank Group
The project involves the investment, financing, construction, operation and maintenance of a transport infrastructure in Hongyan Village, Chongqing Province of China. The construction scope of the project includes a bridge from the middle section of the Jialing River Bridge to the Wutaishan Intersection of Hongyan Village, the three lines of the expressway (the Hongling Village Jialing River Bridg
- Status
- Prospective
- Sector
- Commercial, Road, Government, Tunnel, Bridge
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Chongqing Hongyan Village Bridge and Tunnel Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the investment, financing, construction, operation and maintenance of a transport infrastructure in Hongyan Village, Chongqing Province of China. The construction scope of the project includes a bridge from the middle section of the Jialing River Bridge to the Wutaishan Intersection of Hongyan Village, the three lines of the expressway (the Hongling Village Jialing River Bridge and Hongyan Village Interchange) and the southern section (Hongyan Village Tunnel to Wutai Mountain). It also includes a mountain tunnel and two overpasses. The main line is 6 lanes in both directions. The designed speed is 80 KM/h and the total length is 4.95 KM. The project SPV is called Chongqing Huarong Tianze Infrastructure Development Co., Ltd and owned by 5 sponsors: state-owned Chongqing Urban Construction Investment (Group) Co., Ltd with 5% stake, Huarong Tianze Investment Co., Ltd with 6% stake, China Construction Eighth Engineering Bureau Co., Ltd with 2% stake, China Construction Sixth Engineering Bureau Co., Ltd with 2 % stake and Beijing Huarong Dingzhi Investment Partnership (Limited Partnership) with 85% stake. The project cost amounts to CNY 5,930,660,000 or $ 886.45 million. The project is structured under BOT model for a concession period of 14 years which includes a 4-year construction period. The return mechanism is government payment in the form of "shadow toll". Financial close was reached on 1 March 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=6dbf6271aba64ae18c849e7fc71ebdcf |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government, Tunnel, Bridge |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in China
- Black Point Combined Cycle Power Plant Hong Kong
- Hongyanhe Nuclear Power Plant Liaoning
- Yangcheng CoalFired Power Plant Shanxi Province
- Tianhuangping PumpedStorage Hydro Plant
- Xiangjiaba Hydropower Plant
- Fuqing Nuclear Power Plant Fujian
- Huoqiu County Pipeline Gas Project
- Fuchuan Xiehe Shijia Wind Power Plant