Chopper Ridge Bridge Replacement
Sector: Power Transmission • Location: Westminster, South Carolina, United States
Source: Citizen Portal AI
Demolition at Chopper Ridge bridge is nearly finished. The primary contractor plans to start construction of the new bridge in about two weeks as equipment is moved onto the site. Waterline relocation work was completed to accommodate the new bridge layout, and the system is currently operating on a bypass line with reconnections expected once the new bridge is in place.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Demolition at Chopper Ridge bridge is nearly finished. The primary contractor plans to start construction of the new bridge in about two weeks as equipment is moved onto the site. Waterline relocation work was completed to accommodate the new bridge layout, and the system is currently operating on a bypass line with reconnections expected once the new bridge is in place. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
