CHP Tunnel Priority Repairs
Sector: Water Supply and Storage • Location: Rochester Hills, Michigan, United States of America
Source: Dodge
Description Locate and remove deteriorated and unsound concrete at areas indicated in Project Drawings or as directed by Engineer. Properly prepare surfaces to remain, install required reinforcement shown on drawings, and properly apply and cure repair materials to restore concrete to its original condition and appearance. Polyacrylate Injection Grouting Waterproofing: Conduct curtain wall injecti
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Automotive, Tunnel, Cement, Road
- Location
- Rochester Hills, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CHP Tunnel Priority Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description Locate and remove deteriorated and unsound concrete at areas indicated in Project Drawings or as directed by Engineer. Properly prepare surfaces to remain, install required reinforcement shown on drawings, and properly apply and cure repair materials to restore concrete to its original condition and appearance. Polyacrylate Injection Grouting Waterproofing: Conduct curtain wall injection grouting from interior side of tunnel walls and roof slab to seal against water intrusion to t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Rochester Hills |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Automotive, Tunnel, Cement, Road |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
