logo

Christ Life Harris Hill Campus

Sector: Stadium • Location: San Marcos, Texas, United States of America

Source: Dodge USA

Project
Pre-Design

new facility will be 40,000 square feet in total. The main sanctuary will be 20,000 square feet with a kids wing, which will be an additional 10,000 feet. It will also have an amphitheater for concerts

Status
Prospective
Sector
Stadium, Commercial, Manufacturing (Industrial)
Location
San Marcos, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Christ Life Harris Hill Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Christ Life Harris Hill Campus” is an infrastructure initiative in the Stadium sector, located in San Marcos, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

new facility will be 40,000 square feet in total. The main sanctuary will be 20,000 square feet with a kids wing, which will be an additional 10,000 feet. It will also have an amphitheater for concerts

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

San Marcos

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Stadium, Commercial, Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project