logo

Christensen Dock Repair

Sector: Water Supply and Storage • Location: Naselle, Washington, United States of America

Source: Dodge USA

Project
Planning Schematics

replace an existing dock on the Naselle River. The new dock will be 8 x14 and be composed of a wood frame, including cedar decking with the required grating and plastic floats. The design will be consistent with WDFW requirements. The dock will be pre-constructed and then placed in the same location as the existing dock as soon as it is removed. No pre-construction will take place over the water.

Status
Prospective
Sector
Water Supply and Storage, Commercial, Manufacturing (Industrial)
Location
Naselle, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Christensen Dock Repair

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Christensen Dock Repair” is an infrastructure initiative in the Water Supply and Storage sector, located in Naselle, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

replace an existing dock on the Naselle River. The new dock will be 8 x14 and be composed of a wood frame, including cedar decking with the required grating and plastic floats. The design will be consistent with WDFW requirements. The dock will be pre-constructed and then placed in the same location as the existing dock as soon as it is removed. No pre-construction will take place over the water.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Naselle

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project