Christian Street Bridge Replacement 150-003
Sector: Bridge • Location: Washington, Connecticut, United States of America
Source: Dodge USA
The Town of Washington, Connecticut is seeking sealed bids for furnishing all labor, tools, materials, and equipment required for the Replacement of Christian Street Bridge Over Bee Brook (Bridge No. 150-003)
- Status
- Closed
- Sector
- Bridge, Road, Commercial, Government
- Location
- Washington, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Christian Street Bridge Replacement 150-003
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Town of Washington, Connecticut is seeking sealed bids for furnishing all labor, tools, materials, and equipment required for the Replacement of Christian Street Bridge Over Bee Brook (Bridge No. 150-003) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Washington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial, Government |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
