Christiancy Lift Station (LS11) Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
DESCRIPTION: The existing dry pit pumps will be replaced with two submersible pumps running on VFDs, and a new diesel bypass pump will be installed. Sod replacement, driveway repair, including concrete, soil, and gravel replacement in kind will be required at all disturbed areas. Existing building, generator, existing walls, electrical, and odor control device will be removed.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Cement, Road, Power Generation (CCGT), Consumer Products, Government, Waste Processing and Treatment, Seaport
- Location
- Port Orange, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Christiancy Lift Station (LS11) Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION: The existing dry pit pumps will be replaced with two submersible pumps running on VFDs, and a new diesel bypass pump will be installed. Sod replacement, driveway repair, including concrete, soil, and gravel replacement in kind will be required at all disturbed areas. Existing building, generator, existing walls, electrical, and odor control device will be removed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Port Orange |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Cement, Road, Power Generation (CCGT), Consumer Products, Government, Waste Processing and Treatment, Seaport |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
