logo

Château Lascombes Rehabilitation and Extension / BPM Architectes

Sector: Hotel

Source: ArchDaily

Project
Closed

In 2018, long discussions began between the Château and the agency. The needs, the technical level of the production tool, the evolutivity of the winery and the flexibility of the building all led to the creation of extremely precise specifications that meet the highest standards.This collective effort has resulted in the most accurate possible response to all technical requirements, such as grape

Project Information FAQ

Project Information

3 Q
The project “Château Lascombes Rehabilitation and Extension / BPM Architectes” is an infrastructure initiative in the Hotel sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2018, long discussions began between the Château and the agency. The needs, the technical level of the production tool, the evolutivity of the winery and the flexibility of the building all led to the creation of extremely precise specifications that meet the highest standards.This collective effort has resulted in the most accurate possible response to all technical requirements, such as grape harvest processing, gravity-fed working, vat capacity, etc. These specifications apply to the winemaking unit, in addition to the extension of the bottle storage areas and the winery buildings (shed, tractors, storage of equipment and phytosanitary products).With the acquisition of new vineyard plots, Château Lascombes needed to rethink the production unit, both in terms of capacity and technical aspects. It was necessary to modernize the tools, and the working environment, and meet the exacting standards and precision required to produce an exceptional product.The project was designed to be architecturally continuous with the existing building, opposite the historic one. The new VAT room was not intended to supplant the existing building.Text description provided by the architects.The construction of the new barrel cellar at Château Lascombes marks a new page in the history of the estate. Since the 2000s, BPM Architectes has supported the estate's development through the design of the 2nd year barrel cellar and its wine tourism section, comprising the tasting cellar and boutique, completed in 2018.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data