Colben Energy Holdings, an IPP from Vietnam, was planning the development of the 29.7MW Chu Linh and 11MW Coc San hydropower plants, on the Ngoi Dum Stream, Lao Cai province; and ,Sa Par commune, Trung Chai commune, Sa Pa district. Total capacity was 40.7MW. The project was expected to generate 134.2 GWh and 44.3 GWh annually, to be supplied to the national grid.

Commissioning of the Coc San wa

Project Information FAQ

Project Information

4 Q
The project “Chu Linh and Coc San Hydropower Plants” is an infrastructure initiative in the Hydro sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Colben Energy Holdings, an IPP from Vietnam, was planning the development of the 29.7MW Chu Linh and 11MW Coc San hydropower plants, on the Ngoi Dum Stream, Lao Cai province; and ,Sa Par commune, Trung Chai commune, Sa Pa district. Total capacity was 40.7MW. The project was expected to generate 134.2 GWh and 44.3 GWh annually, to be supplied to the national grid. Commissioning of the Coc San was expected in 2012. For Chu Linh commissioning was expected in 2014. Chu Linh was expected to consist of 2 PELTON turbines of 5.79MW each, 46% load factor. Coc San was expected to consist of 3 PELTON turbines of 10.53MW, 52% load factor. Lifespan was 30 years. Feasibility study was finished in August 2008. The investment certificate was received in September 2009. Electricity tariff was expected to be $0.039 per kWh. Financial close was reached in September 2010 with the Vietnam Development Bank. The debt equity ratio was 70/30. WACC was 15.4%. Total investment was VND 866,823 million ($41.6 million) for both plants, VND 788,580 million for Coc San, VND 456,367 million for Chu Linh. The project applied for UNFCCC/CDM financing. The CERs were sold for EUR11.88 ($15.5) Cost was split as follows (in VND million): Coc San Chu Linh Civil cost: VND 348,879 / VND 224,470 Equipment cost: VND 229,499 / VND 112,527 Land acquisition: VND 5,371 / VND 4,400 Other cost: VND 45,658 / VND 24,299 Consultancy cost: VND 42,389 / VND 23,465 Standby cost: VND 62,577 / VND 36,011 Loan interest: VND 54,207 / VND 31,195 http://cdm.unfccc.int/filestorage/V/R/6/VR60FWUD45I38EZ1M7JKSA9BPHCXGN/PDD_Chu%20Linh%20and%20Coc%20San.pdf?t=dWJ8bTIyd2I0fDBOhm4xOgkZUcxYgaJQ11K_ All info from CDM application

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data