Church St Reconstruction & College St Water Main Replacement
Sector: Water Supply and Storage • Location: Beloit, Wisconsin, United States of America
Source: Dodge USA
APPROXIMATELY: 4325 SY PAVEMENT REMOVAL, 535 SY CONCRETE SIDEWALK REMOVAL, 2690 LF CURB AND GUTTER REMOVAL, 2750 CY COMMON EXCAVATION, 1030 TON HMA PAVEMENT, 4250 SF CONCRETE SIDEWALK 4-INCH, 1020 SF CONCRETE SIDEWALK 6-INCH, 4705 SF CONCRETE DRIVEWAY 6-INCH, 2730 LF CONCRET CURB AND GUTTER, 2370 SY SEED LAWN RESTORATION, PAVEMENT MARKING, AND MISCELLANEOUS ITEMS ASSOCIATED WITH ABOVE WORK. Engine
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Road, Car parking, Automotive, Government, Commercial
- Location
- Beloit, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Church St Reconstruction & College St Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | APPROXIMATELY: 4325 SY PAVEMENT REMOVAL, 535 SY CONCRETE SIDEWALK REMOVAL, 2690 LF CURB AND GUTTER REMOVAL, 2750 CY COMMON EXCAVATION, 1030 TON HMA PAVEMENT, 4250 SF CONCRETE SIDEWALK 4-INCH, 1020 SF CONCRETE SIDEWALK 6-INCH, 4705 SF CONCRETE DRIVEWAY 6-INCH, 2730 LF CONCRET CURB AND GUTTER, 2370 SY SEED LAWN RESTORATION, PAVEMENT MARKING, AND MISCELLANEOUS ITEMS ASSOCIATED WITH ABOVE WORK. Engineering services to prepare plans and specifications to publicly bid the Church Street Reconstructi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Beloit |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Car parking, Automotive, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
