logo

CHWTP - Residuals Conveyance System REBID

Sector: Water Supply and Storage • Location: Louisville, Kentucky, United States of America

Source: Dodge

Project
Closed

Louisville Water Company is requesting Bids providing all labor, rigging, tools, equipment, and materials to install 3,160 +/- linear feet of 20-inch DI solids residual force main and 260 +/- linear feet of 30-inch DI solids residual drain. Furnish and install 280 +/- linear feet of 30-inch steel casing pipe, bore and jack method, 70 +/- linear feet of 74-inch steel casing pipe, bore and jack meth

Status
Closed
Sector
Water Supply and Storage, Rail, Waste Processing and Treatment, Commercial, Steel, Government, Metal
Location
Louisville, Kentucky, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about CHWTP - Residuals Conveyance System REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CHWTP - Residuals Conveyance System REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Louisville, Kentucky, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Louisville Water Company is requesting Bids providing all labor, rigging, tools, equipment, and materials to install 3,160 +/- linear feet of 20-inch DI solids residual force main and 260 +/- linear feet of 30-inch DI solids residual drain. Furnish and install 280 +/- linear feet of 30-inch steel casing pipe, bore and jack method, 70 +/- linear feet of 74-inch steel casing pipe, bore and jack method and 220 +/- linear feet of 66-inch steel casing pipe, bore and jack method under CSX rail. Ins...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kentucky

City

Louisville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Rail, Waste Processing and Treatment, Commercial, Steel, Government, Metal

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project