logo

CI - 27 Gas Field Expansion

One of 425 projects Taiyo tracks in Cote d'Ivoire.

Source: World Bank

Project
Closed

The development objective of the Block CI-27 Gas Field Expansion Project for Cote d'Ivoire is to maintain the availability of clean natural gas for lower cost power generation. The project has two components: The first component is upgrading of the existing foxtrot platform. Foxtrot is the only field in Block CI-27 currently in operation. Gas and a small volume of oil are transported via pipelines

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Natural Gas, Government
Location
Cote d'Ivoire
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about CI - 27 Gas Field Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CI - 27 Gas Field Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in Cote d'Ivoire. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Block CI-27 Gas Field Expansion Project for Cote d'Ivoire is to maintain the availability of clean natural gas for lower cost power generation. The project has two components: The first component is upgrading of the existing foxtrot platform. Foxtrot is the only field in Block CI-27 currently in operation. Gas and a small volume of oil are transported via pipelines to the Vridi terminal in Abidjan, where the gas is sold to the Azito and Compagnie Ivoirienne de Production d’Electricite (Private IPP) (CIPREL) power stations and the oil to the Societe Ivoirienne de Raffinage (Ivorian Refining Company) (SIR) refinery. The supply lines and facilities that service the existing foxtrot platform will be reconfigured to ensure reliability and uninterrupted gas supply after the field expansion. The second component is addition of a new production platform, wells and pipelines to develop the adjacent Marlin field within the CI-27 block. Under this component the Marlin field will be developed as a new separate four-leg fixed platform with eight slots and five wells. The Marlin platform was ordered in February 2013, after a 2-year delay, resulting from the unstable political situation in Cote d'Ivoire, and gas payment arrears of the power sector.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Cote d'Ivoire

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Natural Gas, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project