CI - 27 Gas Field Expansion
One of 425 projects Taiyo tracks in Cote d'Ivoire.
Source: World Bank
The development objective of the Block CI-27 Gas Field Expansion Project for Cote d'Ivoire is to maintain the availability of clean natural gas for lower cost power generation. The project has two components: The first component is upgrading of the existing foxtrot platform. Foxtrot is the only field in Block CI-27 currently in operation. Gas and a small volume of oil are transported via pipelines
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Natural Gas, Government
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about CI - 27 Gas Field Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Block CI-27 Gas Field Expansion Project for Cote d'Ivoire is to maintain the availability of clean natural gas for lower cost power generation. The project has two components: The first component is upgrading of the existing foxtrot platform. Foxtrot is the only field in Block CI-27 currently in operation. Gas and a small volume of oil are transported via pipelines to the Vridi terminal in Abidjan, where the gas is sold to the Azito and Compagnie Ivoirienne de Production dElectricite (Private IPP) (CIPREL) power stations and the oil to the Societe Ivoirienne de Raffinage (Ivorian Refining Company) (SIR) refinery. The supply lines and facilities that service the existing foxtrot platform will be reconfigured to ensure reliability and uninterrupted gas supply after the field expansion. The second component is addition of a new production platform, wells and pipelines to develop the adjacent Marlin field within the CI-27 block. Under this component the Marlin field will be developed as a new separate four-leg fixed platform with eight slots and five wells. The Marlin platform was ordered in February 2013, after a 2-year delay, resulting from the unstable political situation in Cote d'Ivoire, and gas payment arrears of the power sector. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Natural Gas, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Cote d'Ivoire
- Henri Konan Bédié Bridge
- Lagune Aghien treatment plant PPP project
- RCI- Emergency Urban Infrastructure (FY08)
- WATER SUPPLY II
- CI-IVC PNGTER Rural Land Management
- Cote d'Ivoire Agri-Food Sector Development Project
- GREATER ABIDJAN PORT - CITY INTEGRATION PROJECT
- CÔTE D'IVOIRE AF TO STRENGTHENING PRIMARY EDUCATION SYSTEM OPERATION
