logo

CI - 27 Gas Field Expansion

Sector: Water Supply and Storage • Location: Cote d'Ivoire

Source: World Bank

Project
Closed

The development objective of the Block CI-27 Gas Field Expansion Project for Cote d'Ivoire is to maintain the availability of clean natural gas for lower cost power generation. The project has two components: The first component is upgrading of the existing foxtrot platform. Foxtrot is the only field in Block CI-27 currently in operation. Gas and a small volume of oil are transported via pipelines

Project Information FAQ

Project Information

5 Q
The project “CI - 27 Gas Field Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in Cote d'Ivoire. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Block CI-27 Gas Field Expansion Project for Cote d'Ivoire is to maintain the availability of clean natural gas for lower cost power generation. The project has two components: The first component is upgrading of the existing foxtrot platform. Foxtrot is the only field in Block CI-27 currently in operation. Gas and a small volume of oil are transported via pipelines to the Vridi terminal in Abidjan, where the gas is sold to the Azito and Compagnie Ivoirienne de Production d’Electricite (Private IPP) (CIPREL) power stations and the oil to the Societe Ivoirienne de Raffinage (Ivorian Refining Company) (SIR) refinery. The supply lines and facilities that service the existing foxtrot platform will be reconfigured to ensure reliability and uninterrupted gas supply after the field expansion. The second component is addition of a new production platform, wells and pipelines to develop the adjacent Marlin field within the CI-27 block. Under this component the Marlin field will be developed as a new separate four-leg fixed platform with eight slots and five wells. The Marlin platform was ordered in February 2013, after a 2-year delay, resulting from the unstable political situation in Cote d'Ivoire, and gas payment arrears of the power sector.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data