CI 5427 HCTP Storm Water Diversion Project
Sector: Water Supply and Storage • Location: Camarillo, California, United States of America
Source: Dodge
The work to be performed under this Contract shall consist of furnishing all plant, tools, equipment, materials, labor, supplies, and manufactured articles for the Project, as shown on Drawing Number 20-22A Sheets 1-14, Specifications, and Contract Documents. The general items of work include installation of a 30-inch diameter reinforced concrete storm drainage pipe, construction of a retaining wa
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Cement, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Camarillo, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CI 5427 HCTP Storm Water Diversion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed under this Contract shall consist of furnishing all plant, tools, equipment, materials, labor, supplies, and manufactured articles for the Project, as shown on Drawing Number 20-22A Sheets 1-14, Specifications, and Contract Documents. The general items of work include installation of a 30-inch diameter reinforced concrete storm drainage pipe, construction of a retaining wall and open channel and associated outlet structure, installation of an above grade 30-inch diame... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Camarillo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
