logo
ProjectPlanning Schematics

CIAC Water Transmission Main Phase 5

One of 10,000+ projects Taiyo tracks in Florida.

Source: Dodge

Design-Build Services for the construction of approximately 2.8 miles of a new 36 transmission water main from the intersection of W Gray St and N Tampania Ave to W Empedrado St and S Himes Ave. In addition, existing transmission and distribution water mains along the selected route will be replaced as part of the project. The project includes, but is not limited to, design and construction of the

Status
Prospective
Sector
Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Tampa, Florida, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about CIAC Water Transmission Main Phase 5

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CIAC Water Transmission Main Phase 5” is an infrastructure initiative in the Water Supply and Storage sector, located in Tampa, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Design-Build Services for the construction of approximately 2.8 miles of a new 36 transmission water main from the intersection of W Gray St and N Tampania Ave to W Empedrado St and S Himes Ave. In addition, existing transmission and distribution water mains along the selected route will be replaced as part of the project. The project includes, but is not limited to, design and construction of the water mains with extensive utility coordination and restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Tampa

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project