logo
ProjectConstruction Documents

CIAC Water Transmission Main Phase 5

Construction documents · Florida · Last reported Mar 2024

Source: Dodge USA

Design-Build Services for the construction of approximately 2.8 miles of a new 36 transmission water main from the intersection of W Gray St and N Tampania Ave to W Empedrado St and S Himes Ave. In addition, existing transmission and distribution water mains along the selected route will be replaced as part of the project. The project includes, but is not limited to, design and construction of the

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
Location
Tampa, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CIAC Water Transmission Main Phase 5

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CIAC Water Transmission Main Phase 5” is an infrastructure initiative in the Commercial sector, located in Tampa, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design-Build Services for the construction of approximately 2.8 miles of a new 36 transmission water main from the intersection of W Gray St and N Tampania Ave to W Empedrado St and S Himes Ave. In addition, existing transmission and distribution water mains along the selected route will be replaced as part of the project. The project includes, but is not limited to, design and construction of the water mains with extensive utility coordination and restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Tampa

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project